And

And order Vorinostat the earthquake magnitude threshold of high speed railway operation is calculated by different value method, which is shown in Table 3. Table

3 Earthquake magnitude threshold of high speed railway (D takes 2.55). 2.2.3. Threshold under Rain Influence Domestic railway department limits the train running speed based on the size of the rain. If the rain runs moderately which lasts 12 (or 24) hours and the rainfall capacity arrives at 10.0mm–22.9mm (17mm–37.9mm), its speed should be reduced. If the rain runs in a heavy rainy day which lasts 12 (or 24) hours, and the rainfall capacity reaches 23.0mm–49.9mm (33.0mm–74.9mm), the railway lines are supposed to be blocked and the train operation is supposed to be prohibited. For the sake of dimensional consistency, we can turn the hour rainfall volume into annual rainfall volume by the following method: it is universal knowledge that our country’s rain season

will experience a period of 3 months that can be calculated by 12 rainfall times; thus, we categorize the annual rainfall volume into 900mm, 1980mm, and 2970mm, respectively, as the moderate rainfall city, heavy rainfall city, and the storm rainfall city. Accordingly, we can calculate rainfall threshold effects on high speed railway compared with the provisions of the railway departments in Table 4. Table 4 The annual rainfall threshold of high speed railway. 2.2.4. Other Environmental Factors Threshold The current theoretical researches both at home and abroad pay less attention to the lightning, snowing, temperature, and snowfall which will definitely bring some influences on the characteristics of the high speed railway operations.

Because it is difficult to set up a uniform standard to measure the factors, experts suggest that the reference value and the method of combining qualitative analysis can be employed to determine what degree of lightning, snow, and temperature influencing the high speed rail threshold. The environment impact assessment index of high speed railway can be discriminated as in Table 5. Table 5 High speed railway environment impact assessment index discrimination safety threshold. 3. High Speed Railway Environmental Impacts Attribute Recognition Model Attribute recognition model is in essence the problems of multidimensional space between sample and attribution, which Anacetrapib is proposed by professor Cheng and has been widely used in evaluation and classification. The sample space X = x1, x2, x3,…, x31 has been calculated in 31 provinces and autonomous regions in our country, among which each has been given nine high speed rail environmental impact indexes as Ij(j = 1,2,…, 9), and the jth environmental impact assessment index value in the ith region is expressed as xij(i = 1,2,…, 31; j = 1,2,…, 9).

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>